Cooperative Facilities Support - call us: 0151 665 0196

Civils work

Service trench for 11KV cables for major upgrade from 0.5Mw to 8Mw. After forming the trenches the RMU’s (Ring main units) will be positioned over the trench, cables terminated then a GRP (Glass reinforced Plastic) enclosure will be built round the footprint of the plinth.

The first two pictures show 2 of Plinths to support the positioning of 2 of 4Mva transformers which will then be secured by a palisade fence with lockable entrance.
The plinth from third picture is to support a new air handling systems.